Dhaka, Monday, March 30, 2020 10:11 PM   
     
Home Energy BD Energy World Green Energy Opinion Interview Environment Business Others Archive
LATEST >
বাংলা সংস্করণ
   
Govt plans to drill 11 abandoned gas wells

The government is planning to re-drill 11 gas wells which were abandoned or suspended in different periods due to poor prospect of natural gas reserve.

The wells are: Kasba-1, Mubarakpur-1, Srikail-1, Rupganj-1, Sundalpur-1, Saldanadi-1, Muladi-1, Muladi-2, Samutang South-1, Halda-1 and Saldanadi-2.

The ministry of power and energy on Sunday asked state-owned Bangladesh Petroleum Exploration and Production Company Ltd (BAPEX) to conduct a feasibility study as early as possible for drilling the 11 wells.

BAPEX has earlier suspended drilling activities in 34 out of 239 wells those were in progress by local and international oil companies in different period of times.

According to BAPEX sources, Kasba-1 was drilled in 2018 and the authorities did not find any good prospect of natural gas between 2463 meters and 2472 meter from the surface. The gas reserve in the well was estimated at only three billion cubic feet, which was not commercially viable then.

The Mubarakpur-1 well was drilled in 2014 after three potential gas reservoirs were discovered initially at the depth of 4220-4223 meters, 4240-4244 meters and 4595-4604 meters respectively.

But no viable reservoirs were found after the drilling of the well. But the government is planning to drill the well again in the hope of finding natural gas.

BAPEX has found the Srikail-1 well, which was discovered in 2004, to be a highly potential gas well as has six separate zones.

The Rupganj-1 well has a recoverable reserve of 33bcf of gas. The well was abandoned in October 2017 after producing 0.68bcf of natural gas in the same year. Bapex has already conducted a 3D seismic survey on the well.

Besides, the Sundalpur well-1, which was drilled in 2011, was abandoned after producing 9.96bcf of natural gas due to sand and water pressure.

The government will review the viability of the Semutang south-1, which was found commercially non-viable in 2018.

Besides, the government is also reviewing the prospects of Jaldi, Sitapahar, Patiya, Patharia, Sunetra and Kasalang gas wells.

Bapex managing director Mir Md Abdul Hannan said Bapex has discovered six wells from 15 drillings.

Print PDF

   You may also like

Category: Gas
Government installing 2 lakh pre-paid gas meters

Category: Gas
Saudi Aramco to supply LNG to Bangladesh as part of power deal

Category: Gas
Maiden policy on hydrocarbon exploration

Category: Gas
Old Dhaka likely to get 120,000 prepaid gas meters

Category: Gas
Bangladesh receives interest from 12 firms to build LNG terminal

Category: Gas
Gas price raised by 32.8 pc on average

Category: Gas
LNG boosts daily gas supply to 3,200 mmcf

Category: Gas
Proposals to hike gas prices: Public hearing ends; Berc to take ‘judicious’ decision

Category: Gas
Petrobangla signs MoU with Dhaka University’s Geology department
     
    RECENT STORIES   MOST READ
    FOLLOW US ON FACEBOOK
    Recent Gas Stories
Government installing 2 lakh pre-paid gas meters
Saudi Aramco to supply LNG to Bangladesh as part of power deal
Maiden policy on hydrocarbon exploration
Old Dhaka likely to get 120,000 prepaid gas meters
Bangladesh receives interest from 12 firms to build LNG terminal
Gas price raised by 32.8 pc on average
LNG boosts daily gas supply to 3,200 mmcf
Proposals to hike gas prices: Public hearing ends; Berc to take ‘judicious’ decision
Petrobangla signs MoU with Dhaka University’s Geology department
Public hearing on gas price hike starts March 11


Explore the energynewsbd.com
Home
Energy World
Opinion
Environment
Others
Energy BD
Green Energy
Interview
Business
Archive
About Us Contact Us Terms & Conditions Privacy Policy Advertisement Policy