Dhaka, Tuesday, August 14, 2018 02:50 PM   
     
Home Energy BD Energy World Green Energy Opinion Interview Environment Business Others Archive
LATEST >
বাংলা সংস্করণ
   
Agreement to appoint consultant for ERL unit-2 signed

The state-run Eastern Refinery Limited (ERL) signed a deal with Indian firm Engineers India Limited (EIL) to appoint consultant for implementation of the second unit of ERL

"We have planned a series of measures to augment energy production in the country through implementing the ERL unit-2 and setting up the LPG plant to gear up the energy supply," state minister for power and energy Nasrul Hamid said.

Visiting Indian state minister for petroleum and natural gas Dharmendra Pradhan was also present at the signing ceremony.

Mosleuddin, director operation and planning of ERL, and Upendra Moheshwari, director marketing of EIL, signed the agreement on behalf of their respective side on April 19, 2016.

Nasrul Hamid said the government appointed the PMC (Project Management Consultant) for the second unit to be installed by 2018. The present government has undertaken the plan to set up the second unit of ERL to meet the growing demand of refined oil and ensure fuel and energy security in the country.

He said ERL would be able to meet about 76 percent of the total demand of fuel in the country after completion of the project, adding, "Besides, it will increase fuel efficiency of the country to three million tonnes and save huge foreign currency."

After the contract signing ceremony, State Minister for Petroleum and Natural Gas of India Dharmendra Pradhan told journalists that his country was grateful to Bangladesh for selecting an Indian consultancy firm for the praiseworthy project.

"EIL is one of the most famous consultancy firms in the world. I hope they would sincerely extend their cooperation in implementing the project", he added.

Abdul Latif, MP, Indian High Commissioner to Bangladesh Harsh Vardhan Shringla and high officials of ERL and EIL, among others, were present in the signing ceremony.

According to the project, present Crude Oil processing capacity of ERL is 15 lakh tonnes per year. In contrast, current demand for Petroleum Product (POL) stands at nearly 64.00 lakh tonnes per year.

In order to ensure energy security of the country, the government has accepted the construction of Unit-2 Project of ERL having 30.00 lakh tonnes of Crude Oil processing capacity.

On implementation of the Unit-2, Crude Oil Processing capacity of ERL will increase to 45.00 lakh tonnes per year and it will bring in the much needed equilibrium between demand and supply of petroleum products in the country.

It will also ensure production of eco-friendly Motor Gasoline and Diesel Oil and will ensure energy security of the country, it added.

Earlier, the government floated a Request for Proposal for the PMC on July 30 last year and the TEC was asked to submit the report in 10 days.

The second unit of the ERL is likely to be set up involving Taka 8,949 crore by 2018 with a capacity of refining around 3 million tonnes of crude oil annually. The ERL was set up at Patenga near the Chittagong Port in 1968.

Print Friendly and PDF

   You may also like

Category: Petroleum
BPC makes Tk26cr profit in 4 years

Category: Petroleum
Bangladesh urges French help for energy sector

Category: Petroleum
China to give $554m for Single Point Mooring project

Category: Petroleum
15-yr deal likely with India to import diesel thru’ pipeline

Category: Petroleum
No fuel price cut for now

Category: Petroleum
Deal signed for setting up of a 3,000 barrel per day capacity Catalytic Reforming Unit

Category: Petroleum
Govt going to reduce fuel price again

Category: Petroleum
BPC signs deal with Technip for ERL unit-2

Category: Petroleum
Oil price will be not be reduced: Nasrul
     
    RECENT STORIES   MOST READ
    FOLLOW US ON FACEBOOK
    Recent Petroleum Stories
BPC makes Tk26cr profit in 4 years
Bangladesh urges French help for energy sector
China to give $554m for Single Point Mooring project
15-yr deal likely with India to import diesel thru’ pipeline
No fuel price cut for now
Deal signed for setting up of a 3,000 barrel per day capacity Catalytic Reforming Unit
Govt going to reduce fuel price again
BPC signs deal with Technip for ERL unit-2
Oil price will be not be reduced: Nasrul
NRL exports high speed diesel to Bangladesh


Explore the energynewsbd.com
Home
Energy World
Opinion
Environment
Others
Energy BD
Green Energy
Interview
Business
Archive
About Us Contact Us Terms & Conditions Privacy Policy Advertisement Policy